What is the specification document
Technical document detailing materials, brands and finishings to be used: flooring, sanitary ware, taps, internal and external joinery, appliances (if any), insulation, HVAC, kitchen furniture, installations, etc.
It is usually annexed to the private contract and should be detailed. Vague mentions ('mid-range ceramic material') favour the developer and should be rejected at review.
When the change is lawful
- When the contract authorises it for justified cause (supply shortage, evidenced technical improvement) and only with equivalent or better-quality materials.
- When the buyer agrees in writing.
- When required by licence or supervening regulation.
The burden of justifying the change is on the developer.
When unlawful and what to claim
If the change is unilateral and to worse, the buyer can:
- Demand substitution by the agreed material.
- Claim the price difference (proportional price reduction).
- Terminate the contract if the change is substantial.
Technical survey
To prove the difference a technical survey is essential, measuring:
- Quality of installed vs. agreed material (catalogue range, tier, brand).
- Market price of installed material.
- Economic difference.
- Impact on property value.
Typical cases
- High-end porcelain replaced by basic.
- Premium-brand sanitary ware replaced by own-label.
- Thermal-break aluminium joinery replaced by plain aluminium.
- Plastic paint instead of premium matt paint.
- Lower-power/efficiency heat pump.
- Lower-grade hinges and handles in kitchen furniture.
Frequently asked questions
What if the contract says 'materials of equivalent quality'?
Such clause is typically unfair (generic authorisation to amend). The specifically agreed quality remains enforceable.
How much can I claim?
The market price difference between delivered vs. agreed material, plus loss of property value. Quantified by the survey.
Can the contract be terminated?
Yes, if the difference is substantial. In practice a monetary claim is usually preferred.